Saltire Energy

Technical Implementation

Development progress, architecture documentation, and implementation roadmap

Phase 3: Wireframes Complete (95%)

🏆 Phase 3 Complete: Comprehensive Admin System

All 7 admin sections converted to professional tab-based architecture with complete wireframes and technical requirements

17
Individual Tab Components
7/7
Admin Sections Complete
95%
Implementation Ready
Professional Quality

✅ Completed Admin Systems

🔥 High Priority Systems (Complete):

Content Management3 Tabs ✓
Match Operations3 Tabs ✓
Community Management2 Tabs ✓

⚡📅 Medium & Low Priority (Complete):

Commercial Management3 Tabs ✓
Team Management2 Tabs ✓
Media Management2 Tabs ✓

🏗️ Technical Architecture Established

Component Architecture:

  • Tab-based structure: Consistent pattern across all sections
  • AdminCard components: Standardized container system
  • Visual indicators: ✓/✗/⏰/⭐ system throughout
  • Brand compliance: #00105A, #C5E7FF, #FFD700 hex colors
  • Technical requirements: Comprehensive documentation

Design System Maturity:

  • Professional quality: Man United/Barcelona standards
  • Mobile considerations: Touch-friendly 44px targets
  • Accessibility: WCAG 2.1 AA compliance ready

💾 Cross-System Integration Architecture

Supabase Database

  • 166 matches: Pagination & filtering designed
  • 37 teams: Searchable dropdown systems
  • 8 competitions: Simple dropdown management
  • 4 seasons: Current season flagging
  • UUID systems: Backend population patterns
  • League tables: BBC scraper integration (80% complete)
  • Fan polls: Community engagement tracking

Sanity CMS

  • 11 document types: Cross-system linking designed
  • News articles: Creation workflow with category system
  • Match galleries: Highland League team integration
  • Player profiles: Made in Dee system
  • Fan content: Moderation workflow (3-tier approval)
  • Commercial content: Testimonials and packages
  • Heritage content: Timeline and facilities

Cloudinary Media

  • Auto-folder creation: DDMMYY_HomeTeam_AwayTeam
  • Face detection: g_auto:faces, g_auto:face
  • Transform system: 21:9, 16:9, 4:3, square ratios
  • Gallery management: Cleanup and optimization tools
  • Hero image system: Cross-page management
  • Bulk operations: Upload and organization workflows
  • 16x performance: Optimization achieved

🚀 Phase 4: Functional Implementation Roadmap

🎯 Development Sequence (Priority Order):

  1. 1
    Universal AdminModal System
    Schema-driven modal for all CRUD operations
  2. 2
    Match Operations (🔥)
    Real Supabase data with filtering and pagination
  3. 3
    Content Management (🔥)
    News creation and gallery upload with Sanity integration
  4. 4
    Community Management (🔥)
    Fan photo moderation and poll management
  5. 5
    Progressive Rollout (⚡📅)
    Commercial, Team, Media management systems

🔧 Implementation Requirements:

API Routes (Proven Pattern):
src/app/api/admin/
├── matches/route.ts ✅ (EXISTS)
├── content/route.ts
├── community/route.ts
└── commercial/route.ts
Form Validation (Established):
  • • Follow Fan Zone form patterns (5MB limits)
  • • Real-time error handling and user feedback
  • • Preview functionality before submission
  • • FormData submissions with validation
Authentication Strategy:
  • • Phase 4: Basic username/password system
  • • Environment variable protection (current)
  • • Future: Role-based permissions
  • • Emergency fallback: Sanity Studio access

📊 Performance & Quality Standards

✅ Quality Standards Established:

  • TypeScript Compliance: Zero errors maintained
  • Performance: Lighthouse scores >90 target
  • Mobile Responsive: Touch-friendly admin interface
  • Cross-Browser: Consistent experience assured
  • Professional Presentation: Man United/Barcelona quality

🔍 Monitoring & Maintenance:

  • BBC Scraper: Automated monitoring and alerts needed
  • Error Logging: Comprehensive validation tracking
  • System Health: Basic dashboard insights
  • Content Backup: Automated backup systems
  • User Activity: Simple audit trail implementation

🎯 Success Metrics & Validation

🏆 Current Achievement:

Admin Sections:7/7 Complete
Individual Tabs:17 Professional
Wireframe Quality:Production Ready
Technical Docs:Complete

🎯 Phase 4 Targets:

• Universal modal system functional
• Match operations with real data
• Content creation workflows active
• Fan moderation system operational
• 50% reduction in content management time

🚀 Future Enhancements:

• Mobile admin interface
• Advanced analytics dashboard
• Workflow automation features
• Email template system
• Enhanced backup systems